Mayo Clinic Modernization Optimizes Turbines for Hospital Sterilization

The Challenge

The power plant needed to upgrade their controls to ensure continuous steam to the hospital. The continuous supply of 10 psi steam is critical to the heating and sterilization processes of the hospital.

Our Solution

New controls were installed to allow for greater control over the steam turbines ensuring the continuous supply of critical steam to the hospital. The site includes a steam header that is fed by multiple exhaust and extraction sources from the 3 turbines. A complex cascade PID loop was programed by Peaker Services into three Woodward 505XTs to ensure a continuous supply of the critical hospital steam.

Locomotive

Mayo Clinic Modernization Optimizes Turbines for Hospital Sterilization

Locomotive

Cabinet with two new turbine controls installed.

The Mayo Clinic Hospital had commissioned the installation of three steam turbines with the primary purpose of creating steam for the hospital. In order to provide the proper amount of heating and sterilizing steam to the hospital, it was necessary to maintain a continuous supply of steam at 10 psi. Due to our expertise in turbine controls and controls optimization, Peaker was brought in to install, tune and train staff on new controls designed to the Mayo Clinic's needs.

10 psi

continuous steam

Easy access

junction boxes

Improved accuracy

Varistroke Steam Turbine Actuators